Skip to content
YYCCondos.com
HomeBuildingsBeltline

Keynote Two

225 11 Avenue SE · Beltline · SE

Completed
2013
Storeys
36
Homes
250
Developer
Balboa Land Investments

Overview

Keynote Two took the complex's proven formula — homes above a Sunterra-anchored urban village — and stretched it ten storeys higher. Completed in 2013 at 36 storeys and about 250 homes, it is the Keynote ensemble's tower of scale: bigger views, a later design generation, and the same elevator-ride access to groceries, dining and services that makes the complex the Beltline's most self-sufficient address.

Against its 2009 sibling, the second tower offers newer systems and higher ceilings on the view floors at a correspondingly firmer price; against the quarter's pure-residential towers it offers the podium argument no neighbour can match. It is the version of Victoria Park living for buyers who want the district's energy with logistics already solved.

Building facts

Year built
2013Reported

Public sources cite 2013 completion; the assessment roll carries 2011, reflecting the phased construction start. Both describe the same build cycle.

Storeys
36Reported
Homes on record
250Verified

The assessment roll records 251 residential units — effectively exact corroboration of the publicly cited 250.

Construction
Reinforced concrete with brick and metal-panel claddingReported
Developer
Balboa Land InvestmentsReported
Amenities
Fitness and owners' facilities reported; the Sunterra-anchored complex podium supplies groceries, dining and servicesReported
Parking
Underground parkade shared across the complex; arrangements vary by unitVaries by unit
Post-tensioned slab
Governed by corporation records

The corporation's structural drawings, engineering records and reserve-fund study define the slab system and its maintenance history.

Facts are drawn from public developer coverage, City of Calgary open data and editorial review. Confirm material items against current condominium documents before an offer.

Architecture & development

Balboa Land Investments completed the Keynote master plan's second residential phase in 2013 — a 36-storey tower on the shared podium at 11 Avenue and 2 Street SE, alongside the complex's commercial tower. Assessment records carry 2011 from the phased construction start, while completion is publicly cited as 2013; the conflict is chronological bookkeeping, not mystery. The tower's massing steps the complex's street wall up toward the skyline while keeping podium continuity along both frontages.

Homes & layouts

The roughly 250 homes span one-bedroom to two-bedroom-plus-den plans, larger on average in the upper third, with penthouse-tier homes at the crown. North exposures read the downtown towers and library blocks; south and east overlook the Stampede grounds' transformation. The registered plan governs measurements and — as everywhere in this complex — defines the boundary between residential and commercial components.

Amenities

Resident facilities reported include fitness and owners' spaces, with guest accommodation in the complex; the definitive amenity remains the podium's Sunterra Market and services. The shared-facility and cost-sharing agreements set what the residential corporation funds and controls — the single most Keynote-specific document in any purchase here.

Parking & mobility

Complex-shared underground parkade with titled and assigned arrangements varying by unit; visitor and commercial zones interleave with residential, making the registered plan and current parkade rules essential reading. Bicycle storage is reported, and the 12 Avenue cycle track and flat grid keep active commutes practical.

Transit & location

Nearest station: Victoria Park/Stampede~402 m (straight-line)

Roughly 400 straight-line metres to Victoria Park/Stampede station and a similar walk to City Hall station gives residents both Red and Blue line access inside seven minutes. The Central Library, Studio Bell and East Village RiverWalk are five minutes north-east; First Street's restaurants five minutes west. Between the podium and the grid, a carless week here takes no planning.

Five to seven minutes to the platform; City Hall station is a similar walk north, and the complex podium handles most daily errands.

Neighbourhood context

The 11 Avenue frontage puts Keynote Two a block closer than its sibling to the East Village cultural cluster while staying inside Victoria Park's core. The surrounding blocks are the Beltline's most actively redeveloping: event-district construction phases, new towers and public-realm work will keep the context — and some view corridors — in motion for years. The podium's internal ecosystem buffers the daily experience of that churn better than most addresses.

Construction & systems

A 2013 reinforced-concrete tower whose first-generation major documents are now maturing: the current reserve-fund study, envelope performance to date, and elevator planning for a 36-storey stack. Complex-specific diligence centres on the shared-infrastructure cost flows and the division of insurance responsibilities between components. The corporation's structural drawings, engineering records and reserve-fund study define the slab system and its maintenance history.

Buying here

Priorities: the shared-facilities agreement and what it costs the residential corporation annually; the reserve-fund study at the ten-year mark; insurance structure across the complex's components; bylaws on pets, rentals and short-term stays; and your specific stall and locker in the shared parkade. Compare the same exposure in Keynote One — the price gap between towers measures exactly what newer construction is worth to the market that week.

Selling here

Keynote Two sellers hold the complex's premium product: lead with the height-and-podium combination, document the view floor's sightlines against known nearby development, and price against both the sibling tower and the Guardian pair. Buyers cross-shop all four in practice; a listing that anticipates that wins the comparison.

Current listings

Live inventory

Public listings for Keynote Two appear here when they become available. We do not display private CREB or MLS data.

Request current listings

Questions we hear about this building

When was Keynote Two built?

Keynote Two at 225 11 Avenue SE was completed in 2013, developed by Balboa Land Investments.

What kind of construction is Keynote Two?

Reinforced concrete with brick and metal-panel cladding. Acoustic performance, insurance and reserve-planning considerations follow from the structural system; confirm details against the corporation's records.

How many homes are in Keynote Two?

Public records identify 250 homes at 225 11 Avenue SE. Assessment counts may run higher because titled parking and storage are assessed separately.

Does YYCCondos publish sold prices or private CREB data?

No. We publish editorial building research from public sources. Sold prices, MLS remarks, unit numbers and personal identifiers are excluded by policy.

Correct or contribute

Own or manage a unit at Keynote Two? Our researchers welcome factual corrections, updated amenity details, and pointers to public sources we may have missed.

This is an editorial inquiry form, not a live chat or brokerage service. We reply from a Calgary editorial address.